IICSM · FUSION SYSTEMS ENGINEERING

Reliability, survivability and test evidence ↓

Tokamak fusion reactor design

A matching systems-engineering workspace for an illustrative tokamak power plant. Connect the confined plasma, magnet and heating systems to exhaust, blanket, fuel processing and net electricity; track the interfaces that a reduced plasma model cannot resolve.

Magnetic confinement · plasma · exhaust · fuel cycle

Interactive designComponent sizingMulti-node multiphysicsSystem architecturePower trade studyWorked calculationDesign basisComponent designComponent worked examplesCoolant and model mappingFuel and lifetimeOperating statesDesign closureRequirements & verificationThermal grids and system solverCorresponding plasma models

Interactive fusion system design

Select a complete preset, edit the power, geometry, cooling and fuel inputs, then Calculate design. Inspect the power ledger, compare gain/Q sensitivity, and save or reload your design. All values are illustrative assumptions; efficiencies and probabilities are fractions.

Power and operating point
Coolant, heat exchanger and buffer
Plasma geometry and exhaust
Fuel processing

Component-sizing summary and thermal model transfer

Coolant flow (kg/s)
Exchanger area (m²)
Pump electricity (MW)
Buffer capacity (J/K)
All calculated component allocations

Flow and fuel consumption refer to the declared production/full-power state. Pump demand and local heat allocations are parts of existing plant ledgers, not automatically added loads. The buffer neglects losses and finite transfer rate. The tokamak buffer supports continuous duty-average extraction through the entered dwell; at duty=1, the dwell allocation is inactive. The assumed plasma geometry does not replace the generic metre-scale thermal grids.

Mission and system boundary

Sustain an operating plasma scenario that supports useful electrical export, manageable exhaust, fuel accounting and planned component replacement. Plasma gain, confinement and operating duty are inputs to this concept study, not predictions of equilibrium or stability.

Concept study for electricity generation. All calculator presets are hypothetical design assumptions; positive calculated export is a budget result, not validated reactor performance.

The boundary encloses the reactor, fuel cycle, blanket, cooling, power conversion, driver or heating equipment, controls and services. Inputs are electricity, make-up fuel, cooling resources and replacement components. Outputs are net electricity, rejected heat, recovered/exhausted material and maintenance demands. Startup, burn/event production, standby, trip recovery and maintenance are distinct operating states.

Connect plasma physics to plant engineering

A tokamak uses magnetic fields and plasma current to confine a toroidal plasma. The plasma operating point depends on heating, fueling, transport, equilibrium and stability. These must also satisfy exhaust and material constraints; a successful core-power calculation alone does not close a plant design. ITER’s system overview describes these connected challenges.

Separate the gain boundaries

Plasma gain Q compares fusion power with auxiliary power delivered to the plasma. Heating equipment draws more electrical power than it delivers. Magnet, cryogenic, pumping, fuel-processing and other loads must be added before comparing gross generation with grid export. State whether current-drive electrical demand is already in ηheating/Paux or is a separate item; include it once.

Fuel cycle and the blanket

Neutrons leave magnetic confinement. A future D–T plant must recover heat and support a fuel cycle that replenishes consumed tritium, including processing delay, losses and reserve. ITER’s blanket program explanation describes lithium breeding and thermal interfaces. This page assumes a recoverable heat fraction; it does not calculate breeding ratio or neutron transport.

Duty, lifetime and maintenance

Burn duty is the fraction of available operating time spent producing the declared fusion power. Availability is the fraction of the calendar in which the plant is ready to operate. A pulsed scenario needs a heat-buffer and grid-ramping strategy; a continuous scenario needs evidence for sustained current drive and exhaust. Both need component replacement and inspection plans.

Functional architecture and subsystem interfaces

  1. Electrical supplyHeating, current drive, cryogenics
  2. Magnets and plasmaConfinement and assumed fusion power
  3. Exhaust and blanketParticles, heat and neutrons
  4. Primary coolingRecoverable thermal power
  5. Power islandGross electricity → net export

The arrows follow energy conversion. Fuel, diagnostics, protection and maintenance close additional loops; they are not represented by a single energy arrow.

Magnets and cryogenic plant

Allocate toroidal/poloidal field functions, structural interfaces, power supplies, stored-energy protection, cryogenic loads and inspection access.

Interface: Field/control demand → coils; coil loads → structures; thermal load → cryogenics.

Plasma heating, current drive and scenario

Specify delivered heating, electrical conversion efficiency, plasma current strategy, pulse/steady-state assumptions and diagnostics needs together.

Interface: Electrical input → delivered heating/current drive; plasma state → feedback.

Divertor, vacuum and exhaust

Connect plasma-facing heat removal, helium/particle removal, impurity control and fuel recovery. Peak exhaust loading requires a separate model from total plant power.

Interface: Heat/particles → divertor and pumps; recovered fuel → processing.

Fuel cycle and inventory

Supply, recover and account for fuel across the reactor, processing equipment and storage. Define start-up inventory, processing delay, losses and reserve.

Interface: Fuel mass flow, purity and inventory → reactor; recovered exhaust → processing.

Blanket, shielding and primary cooling

Allocate heat recovery, breeding performance, material lifetime and service access together. Track penetrations and replacement outages as system constraints.

Interface: Neutron/heat source → blanket; coolant duty → heat exchanger; recoverable fuel → fuel cycle.

Power conversion and heat rejection

Convert recoverable heat into gross electrical output, then subtract every plant load. Allocate coolant temperature/pressure requirements and environmental heat-sink capacity.

Interface: Thermal power → generator; cooling demand → heat sink; electrical export → grid.

Control, diagnostics and protection

Separate performance feedback from independent protection functions. Define measured quantities, quality flags, timing, interlocks and the response to unavailable sensors.

Interface: Measurements → control; permissives → driver/heating; trip demands → shutdown functions.

Remote maintenance and availability

Design replaceable modules, inspection access, lifting interfaces and outage schedules as part of the concept. Distinguish operational duty from plant availability.

Interface: Condition and dose information → maintenance plan; spare modules and outage duration → availability.

Confinement, waste and site services

Define fuel-containment boundaries, cooling continuity, monitoring, material handling and utility dependencies for normal operation and fault states.

Interface: Heat, inventory and service demands → site; monitoring and condition status → operations.

Interactive plant power trade study

The operating-point inputs are now together in the interactive design worksheet. Efficiencies are fractions, not percentages. Values update immediately and can be downloaded as JSON. The equations are an algebraic system budget; this is separate from the PDE model list.

Edit all power and component inputs in the interactive design worksheet above. Power summaries update while you edit.

Gross electrical (MW)
Net during production (MW)
Calendar average net (MW)
Annual net energy (GWh)

Fusion heat
Recovered heat
Gross electricity
Electric loads
Net electricity
All calculated quantities with units

Budget equations and assumptions

Paux,delivered = Pfusion / Qplasma           [MW]
Pheating,electric = Paux,delivered / ηheating [MW electric]
Precovered = ηcapture × Pfusion             [MW thermal]
Pgross = ηthermal × Precovered              [MW electric]
Pnet,burn = Pgross − Pheating,electric − Pother
Paverage = availability × duty × Pnet,burn
           − (1 − availability × duty) × Pstandby
Eannual = Paverage × 8760 / 1000             [GWh/year]

Capture applies to fusion energy only. Recovery of auxiliary/driver heat and blanket energy multiplication are omitted. Other loads include pumps, cryogenics where applicable, fuel handling, controls and balance-of-plant services; driver/heating demand is subtracted separately. Standby replaces production loads in nonproducing periods. Duty and availability do not change the stated operating fusion power. Annual energy uses an illustrative 8760-hour year. Thermal rejection is recovered heat minus gross electricity; additional unrecovered fusion heat and electrical losses still require a full site heat-rejection study.

The input bounds on the form aid editing; physically infeasible positive values can still be entered. The calculator checks finite values and fraction ranges but does not validate a driver, confinement scenario or component design.

Worked design-point calculation

Assume Pfusion=1000 MW, Qplasma=20, ηheating=.50, ηcapture=.90, ηthermal=.40 and other loads 50 MW. This is a hypothetical power-plant scenario; it is not an ITER forecast.

  1. Delivered auxiliary heating = 1000/20 = 50 MW; its electrical demand = 50/.50 = 100 MW.
  2. Recovered fusion heat = .90×1000 = 900 MW; gross electricity = .40×900 = 360 MW.
  3. Operating burn net = 360−100−50 = 210 MW.
  4. Availability .75 and burn duty .90 give a burn fraction .675. With 5 MW standby load for the rest of the year: average export = .675×210−.325×5 = 140.125 MW, or 1227.495 GWh/year.

Holding fusion power and other inputs fixed, operating break-even requires Q > Pfusion/[ηheating(Pgross−Pother)] = 6.4516. A plasma Q of 5 produces fusion heat but imports electrical power in this scenario. Q=20 does not by itself prove ignition, current-drive feasibility or annual export.

Fuel consumption and self-sufficiency

For D–T fusion, each 17.6 MeV reaction consumes one tritium nucleus. With Ef=17.6×10⁶×1.602176634×10⁻¹⁹=2.819830876×10⁻¹² J:

Reaction rate = Pfusion(W) / Ef(J)                 [reactions/s]
Tritium burn rate = reaction rate × 5.008×10⁻²⁷     [kg/s]
At 1 GW fusion: approximately 1.776×10⁻⁶ kg/s
             = 0.1535 kg per full-power day.

This is consumed fuel, not circulating fuel throughput. A plant inventory model must include unburned recovered fuel, breeding and extraction delays, decay, losses, startup stock and reserve. No fixed breeding-ratio margin is assumed here. Demonstrate recovery and inventory balance over the operating schedule rather than treating a breeding ratio alone as proof of self-sufficiency.

Connect power to coolant and lifetime requirements

Heat-exchanger duty: Pheat = ṁ cp ΔT
Illustration: 100 MW / [4000 J/(kg K) × 50 K] = 500 kg/s.

That arithmetic allocates a flow requirement for an assumed fluid heat capacity and temperature rise. It does not establish pressure drop, allowable temperature, heat-transfer coefficients, corrosion or material lifetime. Iterate the electrical budget with coolant pumping, achievable cycle efficiency and maintenance outages.

Tokamak design basis and load cases

The baseline prescribes 1000 MW fusion power, plasma Q=20, heating electrical efficiency 0.50, recovered fraction 0.90 and thermal efficiency 0.40. It allocates 50 MW delivered auxiliary heating, 100 MW heating electricity, 360 MW gross electricity and 210 MW operating net after 50 MW other loads. These inputs do not establish equilibrium or stability.

AllocationQuantities to closeAnalysis / evidence
Plasma scenarioMajor/minor radius, elongation, current, profiles, burn duration and duty.Equilibrium, transport, stability, fueling and current drive.
Magnets and radial buildAxis and peak-conductor fields, support loads, shielding, ports and cold/warm boundaries.Electromagnetic, structural, thermal and neutron-transport models.
ExhaustSeparatrix power, radiation distribution, wetted area, peak factor and throughput.Edge/divertor model and component thermal-hydraulic tests.
Heat recovery900 MW recovered heat during burn; coolant conditions and buffer inventory.Blanket/coolant analysis, exchanger design and cycle conditions.
Load casesCooldown, energization, current ramp, burn, ramp-down, dwell, disruption, quench and replacement.State-dependent sources, forces and protection responses.

Burn duty 0.80 and availability 0.75 give 123 MW calendar-average net after standby demand in the existing convention. Add a separate current-drive load only if it is excluded from the chosen Q/heating-efficiency ledger.

Radial build and subsystem design details

Allocate the cross-section

Record plasma-to-wall clearance and shaping envelope, first wall/blanket, coolant/manifold space, vessel/shielding, coils/cryostat, supports and service access. Inboard space competes with the solenoid and toroidal-field legs; outboard space serves ports and module removal. Changing one layer shifts radiation, temperature, structural and maintenance constraints to others.

Magnetic field systems

Toroidal-field coils supply the main confinement field; poloidal-field coils support shaping and position control. A solenoid supplies an inductive current-drive function in pulsed concepts. Allocate correction fields, tolerances, insulation, cooling and support forces together. ITER describes these magnet functions.

Heating and current drive

Compare delivered heating/driven current with electricity, coupling efficiency, access and cooling. Separate bootstrap, inductive and externally driven current in the scenario. Continuous and long-pulse operation need different current-drive and power-supply evidence.

Divertor and exhaust

Allocate charged-particle heat, helium removal, impurity control and recovered fuel. Specify spatial/temporal loads and replaceable target interfaces. ITER’s divertor description illustrates local exhaust qualification beyond a core-power budget.

Vacuum vessel and pumps

Allocate confinement barriers, differential pressure, bakeout, seals, penetrations and leak detection. Size effective pumping against throughput/pressure, then include connection conductance and species-dependent capture. See ITER’s vacuum-system overview.

Cryogenics and protection

Inventory static heat leaks, nuclear heating, current-lead demand and transients by temperature level. Convert cold watts to electricity with an explicit refrigeration model. Allocate quench detection, extraction energy, voltage and pressure limits. See ITER’s cryogenic interfaces.

Blanket and maintenance

Compare breeder/coolant/material concepts against heat recovery, extraction, shielding and compatibility. Reserve module handling paths, disconnections and inspection access. Replacement changes fuel inventory, radiation exposure and the power calendar together.

Magnetic, refrigeration and vacuum relations

Magnetic energy density / stress scale: uB = B²/(2μ0) [J/m³ = Pa]
Stored field energy: EB = ∫ B²/(2μ0) dV [J]
Linear lumped circuit: E = ½ L I² [J]
Ideal refrigerator lower bound: Pelectric ≥ Qcold(Thot/Tcold − 1)
Steady vacuum throughput: gas_load = pressure × effective_pumping_speed

At 5 T, uB=9.947 MJ/m³ or 9.947 MPa as a stress scale. This is not coil stress; conductor peak field, force direction and supports matter. The field integral includes space outside the plasma. For 10 kW refrigeration at 4.5 K rejecting to 300 K, even a reversible system needs 656.7 kW electricity; actual demand is higher. Vacuum throughput requires consistent units and measured conductance.

Worked tokamak component allocations

1. Geometry and plasma inventory

Assume R=6 m, a=2 m, elongation κ=1.7.
Elliptical cross-section = πa²κ
Torus volume = (2πR)(πa²κ) = 2π²Ra²κ = 805.360 m³
Aspect ratio = R/a = 3
Prescribed mean fusion power density = 1000/805.360 = 1.242 MW/m³
For uniform equimolar D–T, ne=ni=10²⁰ m⁻³ and Ti=Te=10 keV:
p = 2 ne TkeV KkeV = 0.3204 MPa
Wthermal = 3 ne TkeV KkeV V = 387.10 MJ
At B=5 T, β = p/[B²/(2μ0)] = 3.221%

KkeV=1.602176634×10⁻¹⁶ J/keV. This ideal uniform inventory omits real profiles, triangularity and impurity dilution; beta is not a predicted stability limit. Fusion power remains prescribed. An equilibrium/transport analysis must reconcile power, density, profiles and confinement.

2. Alpha heating to divertor heat allocation

D–T energies: 3.5 MeV alpha + 14.1 MeV neutron = 17.6 MeV
Palpha = (3.5/17.6) × 1000 = 198.864 MW
Paux,delivered = 1000/Q = 50 MW
Assume full alpha deposition, no extra ohmic source, core radiated fraction frad=0.60:
Pseparatrix ≈ (1−frad)(Palpha+Paux) = 99.545 MW
Target deposition fraction fdiv=0.80 → Ptarget = 79.636 MW
Effective wetted area 12 m²; peak factor 2:
qtarget,peak = 2 × 79.636/12 = 13.273 MW/m²

This steady allocation is not an edge-transport result or an allowable material flux. Radiation relocates energy to receiving surfaces. Ohmic heat, incomplete alpha deposition, stored-energy changes and other channels need separate terms. Target heat is already part of the fusion/heating ledger; do not add it again to the full plant heat source.

3. Buffering burn and dwell

Assume burn duty D=0.80 and dwell tdwell=60 s.
Consistent burn duration = D tdwell/(1−D) = 240 s
Recovered burn heat = 900 MW
Continuous average extraction = D × 900 = 720 MW
Dwell energy = 720 MW × 60 s = 43.2 GJ
Burn surplus = (900−720) MW × 240 s = 43.2 GJ
At buffer swing 20 K: Cbuffer ≥ 2.16×10⁹ J/K
At cp=4000 J/(kg K): participating mass ≥ 540,000 kg

The existing 3×10⁹ J/K thermal capacity would fall by 14.4 K during this dwell withdrawal alone. Losses and finite transfer rates raise the allocation. The thermal solver currently uses constant recovered power; it does not implement a burn/dwell schedule. Continuous extraction also changes when electricity is generated, so a state-resolved electrical ledger is needed before using this buffer as a grid-delivery design.

Tokamak operating states and controls

StateResponsibilitiesVerification focus
Cooldown and preparationCryogenics, vacuum/leak checks, cooling and fuel reconciliation.Service dependencies, temperature/pressure envelopes and protection readiness.
Energization and current rampField/current control, heating/fueling, position measurements and supply limits.Transient forces, current/voltage envelopes and valid state estimation.
BurnProfiles, density, position/current, exhaust, blanket and coolant control.Simultaneous power, stability, exhaust, material and fuel constraints.
Ramp-down and dwellEnd fusion production, retain heat removal and account for buffer/fuel state.Thermal-cycle loads, energy ledger and restart readiness.
Plasma fault/disruptionIndependent detection, qualified mitigation and plant coordination.Validated transient loads and protection response.
Magnet quench/supply faultDetect abnormal circuit/conductor states and use designed extraction paths.Actual-magnet hot-spot, voltage, pressure and structural envelopes.
Remote replacementModule handling, fuel accounting, reconnected services and metrology.Mock-up duration, service integrity and renewed qualification.

Separate fast plasma feedback, slower coolant/fuel control and independent protection ownership. Measurements need calibration, validity and latency information; plant-state coordination does not replace local protection.

Coolant, heat exchanger and thermal-model design

Use the current recovered thermal power to size a first-pass flow and exchanger duty. Then close hydraulic pressure drop, temperature-dependent properties, materials, corrosion, tritium compatibility and operating transients. These worksheets use constant properties and do not choose a coolant.

1. Sensible heat duty: Precovered = mass_flow × cp × ΔTcoolant
2. Volume flow: volume_flow = mass_flow / density
3. Pump electricity: Ppump = Δpressure × volume_flow / ηpump
4. Heat exchanger: Precovered = U × A × ΔTlm
5. Buffer: energy = C × ΔTbuffer; participating mass = C/cp
ΔTlm = (ΔT1−ΔT2)/ln(ΔT1/ΔT2), with both terminal differences positive
Equal terminal differences → ΔTlm = that common difference

At cp=4000 J/(kg K) and coolant rise 50 K, 630 MW needs 3150 kg/s and 900 MW needs 4500 kg/s. With density 1000 kg/m³, pressure drop 0.5 MPa and pump efficiency 0.75, the corresponding pump loads are 2.1 and 3.0 MW. With assumed U=1000 W/(m² K) and log-mean approach 35 K, exchanger areas are 18,000 and 25,714 m². The pump allocation is a possible component of the existing “other loads”; add it only if it is absent there.

The example properties are placeholders, not a statement that water at any selected temperature/pressure is suitable. The exchanger approach is distinct from the primary-loop coolant temperature rise. Cycle efficiency must be reconciled with hot/cold reservoir temperatures and losses; reactor-node temperature or coolant return alone cannot establish it. ITER’s cooling-water overview describes separate machine and auxiliary heat-removal users.

Map a design allocation into the existing SINDA-style models

Design quantityModel record / interpretationEvidence needed
Participating thermal inventoryNODE capacity C=m cp [J/K]Identify which material/fluid mass responds over the modeled timescale.
Contact or transfer pathCONDUCTOR G [W/K]; for simple conduction, G=k A/LEffective path geometry, material properties and contact/film resistances.
Heat-removal pathSINK UA [W/K] to fixed return temperatureBoundary condition and effective transfer coefficient; this is not an explicit flow loop.
Fusion heat distributionSOURCE fractions sum to oneDeposition allocation; avoid counting surface/divertor heat again in full recovered power.
Event or production sourceICF AVERAGE/PULSE; tokamak constant sourceTime profile, repeated-event envelope or separate burn/dwell analysis.

The existing grid k=10⁸ W/(m K) is an effective system coupling, not a real solid conductivity. If UA=2×10⁷ W/K and U=1000 W/(m² K), their formal area equivalent is 20,000 m²; actual exchanger sizing still needs the terminal temperatures and approach. A refined grid cannot validate an unsupported material or transfer assumption.

Use the worksheet button to copy the current power-budget controls into the loaded thermal deck, then inspect and solve it. Sizes, flow and fuel estimates stay in the worksheet: assign NODE/CONDUCTOR/SINK values only after selecting the physical subsystem. The nine existing 1D/2D/3D models remain runnable. Compare time-step and grid refinements and inspect the energy residual.

Fuel processing, reserve and component lifetime

For D–T power, consumption follows the reaction-energy ledger. Circulating fuel can greatly exceed consumed fuel. Breeding, extraction, processing, storage and unburned recovery must each have a material boundary and residence time. ITER’s breeding overview describes the lithium blanket and fuel-replenishment interfaces.

Reaction energy Ef = 17.6 MeV × 1.602176634×10⁻¹³ J/MeV
Reaction rate = Pfusion/Ef
Consumed tritium mass flow = reaction rate × 5.008×10⁻²⁷ kg
Consumed T ≈ 0.15345 kg per GW-fusion full-power day
Circulating T flow ≈ consumed flow / single-pass burn fraction b
Processing hold-up ≈ circulating flow × processing residence time
Unburned recovery loss = (circulating flow − consumed flow)(1−ηrecovery)
Storage balance: dM/dt = recovered_unburned + extracted_bred + makeup
                         − injected − storage_losses − λM
λ = ln(2)/tritium_half_life

For a hypothetical 1 GW scenario, b=0.05 gives 3.069 kg T/day circulating flow. A 0.5-day processing residence implies 1.534 kg in that simplified processing stream alone. At unburned recovery efficiency 0.999, the unrecovered stream is approximately 0.00292 kg/day. This excludes blanket extraction hold-up, fixed equipment inventory, decay, reserve and start-up stock. At 700 MW, all these flow-proportional estimates are 0.7 times as large.

In a steady no-external-supply allocation, extracted breeding must cover consumed fuel, unrecovered losses and inventory decay; delays and downtime also matter. A breeding ratio above one by itself does not prove dynamic self-sufficiency. Reconcile processing-stream hold-up and reserve without counting the same inventory twice.

Maintenance and availability allocation

Energy exposure = ∫ assigned_component_power dt
Cycle exposure = count of specified thermal/mechanical cycles
Simple renewal availability estimate: A ≈ MTBF/(MTBF+MTTR)
Independent series subsystems only: Aplant ≈ product of subsystem availabilities
Annual scheduled-outage fraction = total nonoverlapping outage hours/8760

Six statistically independent series subsystems each at 0.95 availability give only 0.95⁶=0.735 overall. Shared cooling, power and scheduled outages violate that independence assumption; use a state/reliability model for the actual plant. Include inspection, cooling/warm-up, access, module removal, replacement, leak/alignment checks and recommissioning in repair time. Lifetime allocation needs neutron spectrum/fluence, irradiation damage, cyclic stress, erosion/corrosion and validated material data; neither MW-year nor cycle count alone qualifies a component.

Design closure and next-model checklist

Question to closeNext model or evidenceAcceptance quantities
Where does the energy go?State-resolved source, thermal/fluid and electrical ledgerSource/removed/stored energy residual; each branch counted once.
Can the coolant remove it?Flow network, exchanger correlations and component testsTemperature, flow, pressure drop, pump electricity and transient margins.
Do components withstand the environment?Neutronics, thermal-stress, irradiation and fatigue analysisSpatial loads, degradation, qualified material limits and replacement interval.
Is fuel continuously available?Delayed multi-compartment inventory modelMinimum stock, circulating flow, extraction/recovery losses and reserve.
Can the plant deliver the declared calendar output?Integrated state/reliability and maintenance scheduleBurn/event duty, common-cause outages, replacement duration and annual export.
Are ignition and device physics supported?Reactive plasma diagnostics plus device-specific validated analysisConfinement/deposition losses and stability; ICF implosion or tokamak equilibrium/exhaust as appropriate.

Carry assumptions, units, uncertainty and source revision with every transferred quantity. Distinguish a calculated sizing allocation, an experimentally supported property and a verified requirement. Record the most sensitive coupled assumptions before selecting a preferred concept.

Requirements allocation and verification plan

The following is a draft traceability structure. Requirement owners must set numerical acceptance criteria and evidence maturity before a design review; no row claims a completed qualification.

IDProposed system requirementOwner/interfaceVerification methodAcceptance evidence to define
SYS-01Export positive average net electrical energy under a declared scenario.Grid connectionPower ledger + uncertainty sweepPnet, Paverage, GWh/year; all loads included.
SYS-02Maintain a closed fuel inventory ledger across operating and outage states.Fuel-cycle leadDynamic inventory model + integrated testProduction/recovery, losses, delay and reserve explicitly allocated.
SYS-03Remove assigned heat in the normal state and defined loss-of-power states.Thermal systemsThermal-hydraulic analysis + component testHeat duty, temperature, pressure and cooling continuity.
SYS-04Provide observable operating state and independent protective actions.Control/protectionFault injection + hardware integrationSensor failure, timing budget, safe-state criteria.
SYS-05Replace life-limited components within the availability allocation.MaintenanceService mock-up + schedule analysisAccess, replacement duration and spare readiness.
SYS-06Trace material lifetime and containment requirements to the source environment.Materials/confinementIrradiation data + structural/containment analysisEvidence for load cycles, neutron exposure and degradation.
TOK-01Close the selected plasma scenario with heating/current-drive, stability and exhaust evidence.Plasma + heating + exhaustIntegrated scenario simulation and experimentConfinement, current strategy, pulse duty and exhaust limits.
TOK-02Keep magnets serviceable and protected under defined normal and fault loads.Magnet/cryogenic systemsStructural/thermal analysis + protection testLoads, cryogenic demand, stored energy and access.

Interface control records

For every interface, record the source and receiving subsystem, quantity, units, sign convention, reference boundary, normal range, transient envelope, timing, uncertainty, owner and revision. Separate a measured value from an assumed allocation. For example, blanket_to_power.heat_MW is positive into the power island; power_island_to_grid.net_MW is positive export after all electrical loads.

Design reviews

  1. Concept review: mission, operating states, energy/fuel boundaries and candidate architecture.
  2. Requirements review: traceable allocations, margins, interfaces and verification ownership.
  3. Preliminary design: linked subsystem analyses, experimental evidence, uncertainty and serviceability.
  4. Detailed design and integration: closed interfaces, qualified components, fault response and maintenance plans.
  5. Commissioning evidence: staged component-to-system tests, calibrated ledgers and measured operating envelope.

Critical trades and unresolved evidence

Trade / uncertaintySystem consequenceNext evidence
Confinement and current-drive demandAssumed plasma Q may be incompatible with the selected scenario or recirculating-power budget.Validate a plasma scenario; sweep Q, efficiency and explicit current-drive loads.
Heat exhaust and material lifetimeAverage blanket heat does not bound local divertor loads or transient damage.Use dedicated exhaust, structural and irradiation models with measured benchmarks.
Disruptions and magnet/cryogenic availabilityPlasma faults and protection events can affect equipment life and duty.Develop an integrated fault-response and maintenance evidence plan.
Fuel reserve and processing delayA positive power budget cannot supply fuel inventory.Run a time-dependent material ledger with availability and losses.
Efficiency versus lifetime and availabilityA favorable design point may require frequent replacement.Include degradation, replacement outages and uncertain load allocations.

Record uncertain gain/Q, conversion efficiency, availability and load allocations separately. Sweep them jointly, avoid counting coupled benefits twice, and report ranges before selecting a preferred architecture.

Corresponding models in the fusion solver

Open the six runnable worked models (sign-in required). They provide inspectable checks of reaction power, loss balance, burn bookkeeping and thermal transport.

Worked modelSystems-engineering useLimit of the model
1. Cooling onlyCheck confinement-loss and energy bookkeeping.Uniform ODE; no device confinement prediction.
2. Fixed D–T heatingConvert reaction rate to alpha/neutron power.Maintained fuel and prescribed rate.
3–4. Bosch–Hale balanceCompare source/loss sensitivity to assumed confinement.No tokamak equilibrium or ICF implosion.
5. Fuel depletion and ashVerify consumed fuel, product energy and wall allocation.Isolated Maxwellian node; no breeding or fuel processing.
6. Two-node heat transportCheck interface energy cancellation and projected diffusivity.Prescribed transport; no blanket/neutron design.

Use the coupling workbench (sign-in required) to transfer declared heat sources into thermal/fluid/solid models. Preserve the volume conversion from W/m³ to W and account for each energy branch once. Tokamak equilibrium, stability, current drive, edge exhaust and breeding require dedicated validated analyses.

Primary references and scope

Reference context reviewed 10 October 2026. Equations and worked budgets on this page are transparent educational reductions. No preset represents an approved plant design or demonstrated commercial performance. The new dimensions, properties and component loads are illustrative allocations. Detailed target construction, qualified hardware specifications and equipment operating procedures require separate validated analyses. Independently verify consequential engineering results.

Level 2 · Blanket/coolant flow path and metal inventory

Carry the current system-level inputs into component sizing, then use explicit allocations to build native PDE inputs. The top worksheet remains the system budget.

Level 3 · Native multi-node PDE worked examples

Use the existing SINDA-like PDE workbench. Thermal and structural models use native numbered-node decks; electric loss examples use numbered SINDA-like DC circuit records translated to the existing circuit calculator. Native beam, torsion and vacuum calculators extend the same protected workbench.

Sign-in required to run PDE calculations. The current editor is transferred in this tab and retained through sign-in. Select Import prepared engineering case, inspect panel 2, then Run combined model. Standalone verification and result downloads remain available in the workbench.

Each thermal case also has one fixed sink boundary. Native support and beam/shaft meshes are separate one-dimensional chains; the displayed thermal grid does not imply a 2D continuum structural solve.

Explicit active thermal nodes and lateral conductors. Every node also has a sink conductor.
Editable native subsystem allocations

Changing the heat allocation overrides the default loss allocation in the native DC heater test. Native beam, shaft and vacuum parameters remain explicit in their individual decks and can be edited below.

Open supplied baseline in PDE workbench · Download supplied SINDA-like input · Download baseline native results · Download all three cases and added solver source

Node equations and interface sequence

1. Thermal: Ci dTi/dt = Qi + ΣGij(Tj−Ti) + UAi(Tsink−Ti).
   Each supplied case finds a steady state using the existing thermal solver.
2. Electrical loss cases: native DC solve → I; heat = I² R.
   Explicit SCALE/MAP ports allocate heat; CONSERVE checks their sum.
3. Thermal node temperature → native solid TEMP in kelvin.
   The workbench converts native thermal degrees Celsius explicitly.
4. Axial support: Ku = F + Fthermal; εthermal=α(T−Treference).
5. Beam, where present: EI d4w/dx4=q, cubic Hermite FEM; each station
   has transverse deflection w and slope θ.
6. Shaft, where present: −d(GJ dφ/dx)/dx = torque density;
   circular-shaft shear τ=G r dφ/dx.
7. Vacuum, where present: Vi dpi/dt = Qi + ΣCij(pj−pi)−Si(pi−pbase).
   Backward Euler; pressures are Pa and throughput is Pa m³/s.
8. Coolant, where present: Δp=R mdot; outlet rise Q/(mdot cp).
   This separate coolant check uses the same design heat allocation.
Expected results for supplied baseline decks
Native steady thermal and support results; vacuum has a separate transient history
Active nodesMaximum thermal temperature (K)Maximum support displacement (m)Native categories
3594.4721090.0200058584THERMAL, SOLID, FLUID
5593.2290550.020236189THERMAL, SOLID, FLUID
9594.4721090.0200058584THERMAL, SOLID, FLUID

References apply to the supplied default decks, not edited inputs. The linear thermal solution was checked independently; beam/torsion cases were compared with closed-form cantilever/shaft results, and vacuum throughput with its inventory balance. Refine the mesh or halve transient dt for changed models.

These are component models with declared material and boundary allocations. Thermal-to-solid transfer is one way; the separately evaluated coolant, beam, shaft and chamber checks do not form a synchronized full-system transient. Constant-property cold models do not establish a cryogenic material database or quantum-computer performance.

All native PDE calculators and connections · Added beam, torsion and vacuum input documentation

Reliability, survivability and test-data updates

Subject-specific threats: Magnet quench, disruption loads, cyclic heating and vacuum loss.

Define a mission, success criterion and operating environment before collecting evidence. The three required subsystem groups below contain six named component items. Series independence is an illustrative allocation; common-cause faults, redundancy, protective actions and dependencies require a corresponding fault tree or state model.

Illustrative test records, not measured field or qualification data. Priors at upper levels match the initial series allocation mean but have separately declared strength.

Appropriate evidence campaign: Component: insulation/support and vacuum-service tests. Subsystem: magnet, heating and cooling integration under defined pulses. System: complete operating campaigns with declared plasma, field, vacuum and heat-removal criteria.

Edit part, subsystem and complete-system test records

Binary counts refer to independent complete missions at the defined duration and pass criterion. Lifetime data is a separate constant-rate model: count actual failures and total unit-hours, including time on surviving/censored units. Each row contains different test campaigns at its level; do not duplicate a component failure as additional independent system evidence.

Level / named itemBeta α priorBeta β priorMission successesMission failuresGamma shape priorGamma rate prior (h)Operating failuresTotal unit-hours

How evidence changes each design level

Prior / early / mature example stages from left to right; green: part rollup, blue: subsystem-test rollup, brown: direct system evidence. Vertical position is reliability on a 0–1 scale; bars show 95% credible intervals. Seeded independent posterior sampling estimates product intervals.

More data increases evidence strength, but the estimated reliability can move down when failures appear. An early failure is useful evidence. Differences between part rollup, integration trials and mission trials reveal assumptions to revisit; they are not three independent reliability factors to multiply.

Zero-failure bounds versus prior-based credible intervals

Zero observed failures is not 100% demonstrated reliability. With n independent trials and no failures, the one-sided 95% binomial lower bound is 0.05^(1/n). With E total unit-hours and no constant-rate failures, the separate 95% upper rate bound is −ln(0.05)/E. These confidence bounds use different assumptions from Bayesian credible intervals.

Native PDE survivability calculation example

Open this study’s native physical baseline in PDE calculators. Load a completed native result to compare calculated maximum temperature and stress with the entered limits. Use the heat/mechanical factors to prepare a new native stress case; the existing solver workbench performs the physical calculation.

Loading the supplied native baseline…

The native factors are explicit independent sensitivity changes. They do not create a calibrated coupled hazard model. A thermal/stress limit check does not predict solder fatigue, radiation upset, magnet quench, corrosion, leakage, decoherence or other unmodeled modes. On PWB, a modeled body temperature also needs the separately stated internal junction-rise calculation when compared with a junction rating.

The constant-rate lifetime model does not describe cumulative wear-out or solder/bond/via fatigue without justification. Keep fixed-mission outcomes at matched age/cycle history, or fit a suitable censored lifetime/fatigue model. Hours and cycles are different exposure units; changing the lifetime mission duration does not transform the stored binary mission outcomes.

Conditional event survival and ordinary mission reliability

Environmental test outcomes estimate the conditional probability q of surviving a defined event severity. A Poisson count ν gives Senv(q)=exp[−ν(1−q)]. The displayed point uses posterior-mean q; a native margin is never silently converted to q. Combining Senv with ordinary mission reliability requires separate failure populations and independence. An event-triggered failure already counted in mission trials must not be counted again.

Download editable worked test-data example · Download reliability calculations and source · Reliability guide · Survivability guide.

Equations and the path from assumptions to evidence

Binary mission success:
 p ~ Beta(α,β); s successes and f failures → Beta(α+s,β+f).
 Posterior mean = (α+s)/(α+β+s+f).
 95% equal-tail credible interval uses Beta quantiles.
 Independent required parts: Rsystem=∏Rpart; propagate posterior
 uncertainty using separate component draws, not product endpoints.

Constant-rate lifetime evidence, a separate model:
 λ ~ Gamma(shape a, rate b hours); r failures and E unit-hours
 → Gamma(a+r,b+E). Rate mean=(a+r)/(b+E) per hour.
 Posterior predictive R(t)=E[exp(−λt)]=[(b+E)/(b+E+t)]^(a+r).
 Parameter-uncertainty R bounds reverse the rate-quantile endpoints.
 Total E includes right-censored survivors; it is not only failed-unit time.

Conditional survivability:
 q posterior comes from comparable qualification outcomes.
 Senv(q)=exp[−ν(1−q)] under independent Poisson events.
 Physical model → temperature/stress margin; test likelihood → probability.
 These are distinct steps and distinct uncertainty sources.
  1. Concept / system level: write the mission boundary, failure definition, prior assumptions and allocated block structure. Simulation provides loads and possible failure modes, but does not create observed life data.
  2. Part level: add matched-population coupon/component successes, failures, failure times and censored exposure. Update each part posterior. Retain material lot, geometry, assembly process, environment and failure-mode labels; the series rollup inherits these assumptions.
  3. Subsystem level: test interfaces, cooling/power dependencies, controls and protective actions. Compare independent integration-trial posteriors with the part-based subsystem prediction. A gap can reveal assembly effects or common causes. Do not pool integration outcomes with reused part outcomes as if they were independent.
  4. System level: use complete mission trials and field exposure under representative duty/environment. Compare the direct system posterior with lower-level rollups. A mission definition, repair policy, operating profile or design revision changes which data are exchangeable.
  5. Physical calibration: use measured temperatures, strains, pressure or leak rates to update native material/interface/load inputs and their uncertainty, then rerun the PDE cases. Use actual failure/success observations for a reliability likelihood. A model-fit temperature correction is not itself a failure-rate observation.
  6. Qualification / survival: record the event severity, exposure duration, pass criterion, conditioning history and surviving/failed units. Conditional survival applies to that envelope. Screening or destructive-limit tests are not automatically representative field-life trials.
  7. Accelerated tests: convert exposure only with a validated failure-mode acceleration law. Store both raw and equivalent use-condition exposure. Temperature acceleration, cycle-fatigue and chemical degradation need different models; an Arrhenius factor is not a universal correction.
  8. Review and update: show prior sensitivity, credible/confidence bounds, sample size and unresolved common-cause assumptions. Track design revisions and retests, avoid counting one event twice, and investigate early failures even when they lower the estimate.